Super Trident
sewage treatment plant
Small STC-13 series
STC01-13
STC02-13
STC06-13
Chemical Dosing Unit
STC01-13,
STC04-13
STC06-13
Chemical Dosing Unit
STC02-13
STC03-13
STC01-13
STC02-13
STC03-13
STC04-13
STC06-13
Jimmy Ling 凌继远
手机:18026210581(微信)
邮箱:18026210581@189.cn
广州科曼德机电设备有限公司
ST8-C
ST10-C
ST13-C
ST15-C
ST20-C
ST25-C
ST30-C
ST40-C
ST50-C
ST60-C
Jimmy Ling 凌继远
手机:18026210581(微信)
邮箱:18026210581@189.cn
广州科曼德机电设备有限公司
MAIN TANK
AIR COMPRESSOR
DISCHARGE PUMP
CHLORINATION AND DECHLORINATION
ELECTRICAL CONTROL PANEL
Fitted vacuum sewage collection equipment
• Conditioning water flow meter
• Standby compressor (mounted)
• Standby discharge pump (mounted)
• Maceration
• Separate sewage feed system
• Retrofit options available to aid installation
1 Isolating Valves – Air System
2 Chlorination pump (Sodium Hypochlorite)
3 De-chlorination pump (Sodium Bisulphite)
4 Dosing Skid chemical container bunds –
(4A) Chlorination & (4B) De-chlorination
5 Emergency overow connection from the
contact tank (efuent)
6 Level control switch for contact tank
7 Emergency air inlet connection
8 Rotary air blower
9 Control panel for sewage treatment tank
10 Seawater supply for initial lling and cleaning
(use clean seawater or fresh water – not harbour water)
Jimmy Ling 凌继远
手机:18026210581(微信)
邮箱:18026210581@189.cn
广州科曼德机电设备有限公司
11 Discharge pump
12 Overboard discharge (installer to comply
with appropriate legislation)
13 Orice plate (for air lift supply to returned
activated sludge system)
14 Returned activated sludge pipe
(from settling tank to aeration tank)
15 Aeration tank sample point
In principle, the Super Trident Sewage Treatment unit comprises a tank,
divided into three water tight compartments – an aeration compartment,
a settling compartment, and a chlorine contact compartment.
The incoming sewage enters the aeration compartment,
where it is digested by aerobic bacteria and micro organisms which are promoted in the
sewage itself by the addition of atmospheric oxygen.
Jimmy Ling 凌继远
手机:18026210581(微信)
邮箱:18026210581@189.cn
广州科曼德机电设备有限公司
From the aeration compartment the sewage ows into the settling compartment where the aerobic bacteria oc,
known as activated sludge, is
settled out producing a clear efuent which passes into the contact compartment.
16 Black/Grey water inlets – (16A) Raw
sewage & urinal/Grey inlet & (16B)
Hospital black/grey water
17 Vent connection to funnel or mast
18 Branch above maximum waterline (prevents system back-up)
19 Storm valve
20 Efuent discharge ow control valve
21 Final efuent sample point and pressure gauge
22 Chlorination (sodium hypochlorite)
injection valve
23 De-chlorination (sodium bisulphite) injection valve
Jimmy Ling 凌继远
手机:18026210581(微信)
邮箱:18026210581@189.cn
广州科曼德机电设备有限公司
24 Contact tank sampling point
25 Access Hatch for cleaning screen lter
26 Isolation valve – Contact Tank
27 Isolation valve – Aeration Tank
28 Isolation valve – Settling Tank
29 Vent – Contact Tank
30 Dosing Chemical container – Chlorination